DEVELOPMENT STANDARDS SECTION 11 – PERMITTING 5 WATER PERMITS Reimbursement Agreement Fee: See the Development Reimbursement Agreements, included at the end of this section, to see if the specific parcel(s) is subject to a City or Developer Reimbursement fee. Plant Investment Fee: The Plant Investment Fee, as follows, is based on the size of the water meter being installed. METER SIZE 2019 PIF* 2020 PIF* 3/4 inch or smaller $3,080.00 $3,600.00 1 inch $5,144.00 $6,012.00 1-1/2 inch $10,256.00 $11,988.00 2 inch $16,416.00 $19,188.00 3 inch $30,800.00 $36,000.00 4 inch $51,344.00 $60,012.00 6 inch $102,656.00 $119,988.00 8 inch $164,256.00 $191,988.00 *Per City Ordinance 9.92.400 Water Meter Connect Fee: The Water Meter Connect Fee, as follows, is for the size of meter being installed, per ECC 9.92.400. LABOR AND METER ONLY METER SIZE MAX GPM MATERIAL COST COST 5/8 - 3/4" 18 $900.00 $190.00 1" 45 $1,000.00 $240.00 Charges for services with meters larger than one inch shall be computed by the Public Works Director to reflect the actual costs of installation When meters are exchanged, without changing the size of service pipe, credit shall be allowed as follows: METER SIZE CREDIT 5/8 - 3/4" $45.00 1" $120.00 1-1/2" $360.00 2" $750.00 3" $1,200.00 4" $2,250.00 6" $4,500.00 Public Works Application Fee: Required for Work within City Right of Way, per ECC 4.06.100. $25 FEE Hydrant Use: Fee, as follows, for the use of water from a City fire hydrant. The City of Ellensburg reserves the right to install a meter, and bill for the appropriate water usage. $100 first month/per permit $25 per week/permit after first month Plus Consumption – per current Water Rate Backflow Assembly: Refundable deposit required for the backflow assembly device placed on the fire hydrant. $400 Refundable Deposit